Electrician and Tesla Powerwall Installer for the Southern Gulf Islands

Bourne Electric installs battery backup, solar and electrical systems on Salt Spring, Galiano, Mayne, Pender and Saturna Islands. Grid power on the islands is less reliable than on the mainland, and a generator means bringing fuel over on the ferry. A home battery solves both. Our electricians are all Red Seal, and we’re a licensed electrical contractor (Technical Safety BC Licence LEL0101560).

Forested shoreline with a small boat on calm water
Tesla Powerwall installed by Bourne Electric in a West Vancouver garage

Tesla Powerwall for Island Homes

Tesla Powerwall 3 stores energy from the grid or from solar panels and powers your home through an outage. It has a solar inverter built in, so a solar system needs fewer parts, and without solar it is a generator alternative that needs no fuel. We install Powerwall in single-family homes, duplexes, laneway homes and business locations.

Off-Grid EG4 and Sol‑Ark Systems

For off-grid cabins and island homes, we install EG4 and Sol-Ark battery and inverter systems. With EG4, solar panels charge the batteries and a backup generator can top them up through a long stretch of cloudy weather. Tesla Powerwall 3 suits most homes on the grid; EG4 suits off-grid homes, larger battery banks and systems with a generator.

Solar panels on a shingle roof
Electrician working on lighting from a ladder

How Island Installs Work

We plan around the BC Ferries schedule, booking site visits, equipment and crew together so the work takes as few trips as possible. Send photos of your electrical panel, main breaker, meter and installation spot with your quote request, and we can scope much of the job before the first trip.

Questions From Island Homeowners

Which Islands Do You Serve?

Salt Spring, Galiano, Mayne, Pender and Saturna, along with Greater Vancouver on the mainland.

Do I Need Solar Panels for a Powerwall?

No. Powerwall 3 charges from the grid and works as a generator alternative on its own. Adding solar lets it recharge from the sun during a long outage.

How Long Does an Island Installation Take?

A typical residential Powerwall installation takes 3 to 4 days, depending on site conditions, the same as on the mainland. For EG4, Sol-Ark and solar systems, we confirm the plan when we quote, and we schedule ferry travel around the work.

Do You Install EV Chargers on the Islands?

Yes. We install the Tesla Wall Connector and EV chargers for every brand of vehicle on the Southern Gulf Islands, as on the mainland.

Do You Install Solar Panels on the Islands?

Yes. We install solar on Salt Spring, Galiano, Mayne, Pender and Saturna, working with professional roofers, and can pair it with Tesla Powerwall 3 or an EG4 or Sol-Ark battery system.

Mountains above an evergreen forest at dawn

Tel/Text: 778.296.2500

Toll Free: 1.800.270.1781

Email: Information@Bourne-Electric.com

Bourne Electric Ltd.


Technical Safety BC Licence: LEL0101560